Obtain water connection

Procedure

  • Checklist for obtaining water connection
  • Water & Sewerage tariff Policy
  • Certificate from a plumber registered with the Authority.

Download Booklet

Time limit: – 05 working days from the date of receipt of application.

NOTE: It would be preferred to print on A4 sheet.